- Volume
- 5 sets a month
- Since
- 2016
- Finish
- Galvanised or powder coated
- Scope
- Platforms, ladders, railings
- Status
- Ongoing since 2016
The project
Repeat work to a monthly schedule: every set has to fit the plant like the last one.
What we made
- Platforms
- Ladders
- Railings
- Blasting, galvanising or powder coating
- Assembly to tolerance
How we built it
- Trumpf TruPunch 1000 CNC punchingGrating and plates punched.
- Deratech 8 m tandem press brakeStringers and kick plates formed.
Five sets every month, without a break, since 2016.
More case studies
Oil & gas · Hazira, Gujarat
A 50 m enclosed ground flare chamber, delivered in 3 months
50 m high, 200+ T, delivered in 3 months
Oil & gas · USA
A 35 m flare riser with its liquid seal
A 35 m riser with its liquid seal, tip and access
Bridges · Mumbai-Pune Expressway
Pylon anchor boxes for the Missing Link cable-stayed bridge
60 anchor boxes of about 18 T each, 1,000+ T
Oil & gas · Hazira, Gujarat
A 50 m enclosed ground flare chamber, delivered in 3 months
50 m high, 200+ T, delivered in 3 months
Oil & gas · USA
A 35 m flare riser with its liquid seal
A 35 m riser with its liquid seal, tip and access
Bridges · Mumbai-Pune Expressway
Pylon anchor boxes for the Missing Link cable-stayed bridge
60 anchor boxes of about 18 T each, 1,000+ T