The project
Accropode units interlock on the breakwater, so every unit must have the same shape. The mould is what guarantees it.
What we made
- Design detailing
- Mould skins and stiffeners
- Machined parting flanges
- Fixtures and prototype casting
How we built it
- Deratech Supera-H 12030 fibre laserSkin plates cut to every facet.
- SKDX1030 CNC end-face millingParting flanges machined.
We were the third company to develop an Accropode mould in house; a further set of 2 to 16 m³ followed, delivered in a month.
More case studies
Mining · Tanzania
Crusher and screening building for the North Mara gold mine
1,000+ T of crusher and screening steel
Cement · Gujarat
Space-frame sheds for lime, coal and lignite at a cement plant
2,500+ T for lime, coal and lignite sheds
Material handling · India
Curved pipe-conveyor galleries
100+ T, curved in plan, assembled in house
Mining · Tanzania
Crusher and screening building for the North Mara gold mine
1,000+ T of crusher and screening steel
Cement · Gujarat
Space-frame sheds for lime, coal and lignite at a cement plant
2,500+ T for lime, coal and lignite sheds
Material handling · India
Curved pipe-conveyor galleries
100+ T, curved in plan, assembled in house
Start a project
Send us a drawing
A project like this?
Send the drawings and an engineer will tell you how we would build it.