- Steel
- 1,800+ T
- Type
- Track-mounted, hydraulic, electric
- Finish
- Blasted, galvanised or painted
- Destination
- Sydney, Australia
- Status
- Delivered
The project
Large curved shutters that move on hydraulics, built to formwork tolerances and certified before export.
What we made
- Curved shutter panels
- Gantry frame and travel
- Hydraulic and electric fit-out supports
- Assembly to tolerance and certification
How we built it
- Three-roll pinch cum pyramid plate rollsShutters rolled to the tunnel profile.
- Kotec newRun10DX CNC beam drilling lineFrames drilled for the hinges and rams.
Assembled to tolerance, certified and shipped to Australia.
More case studies
Ports · Paradip Port, Odisha
Accropode breakwater moulds for a jetty at Paradip
2 to 6 m³ moulds made to CLI guidelines
High-speed rail · Mumbai-Ahmedabad
Moulds and steel for the Mumbai-Ahmedabad high-speed rail
500+ noise barriers and 600+ cable ducts cast
Mining · Tanzania
Crusher and screening building for the North Mara gold mine
1,000+ T of crusher and screening steel
Ports · Paradip Port, Odisha
Accropode breakwater moulds for a jetty at Paradip
2 to 6 m³ moulds made to CLI guidelines
High-speed rail · Mumbai-Ahmedabad
Moulds and steel for the Mumbai-Ahmedabad high-speed rail
500+ noise barriers and 600+ cable ducts cast
Mining · Tanzania
Crusher and screening building for the North Mara gold mine
1,000+ T of crusher and screening steel