
Case study · Bridges & metro
Stainless steel piers, pier caps and girders for the Mumbai Metro.
A dedicated line for stainless steel bridge members: piers, pier caps and girders in IRS 450 stainless, 25 to 75 mm thick, for metro and flyover bridges in Mumbai.
- Stainless steel
- 25,000+ T
- Grade
- IRS 450
- Plate
- 25 to 75 mm
- A first
- Stainless flyover girders in India
- Status
- In execution
The project
Stainless steel at this thickness and volume had not been built into Indian bridges before. It needed its own cutting, bevelling and welding line.
What we made
- Piers and pier caps
- Box girders
- Edge bevelling and milling
- Robotic welding with a plate manipulator, and SAW
How we built it
- Messer MultiTherm PRO CNC plasmaPlasma cutting and edge bevelling.
- SKDX1030 CNC end-face millingEnds milled square.
- Submerged-arc (SAW) welding lineSubmerged-arc welding of long seams.
Now growing into Allmarc AM InfraCon, our JV, with 75,000 T of stainless steel planned for flyovers over the next 3 years.
More case studies
Roads · Uttar Pradesh
Nine toll plaza canopies on the Ganga Expressway
9 toll plazas and a 38 m gateway arch, 1,200+ T
Tunnels · Mumbai
Conveyors and brackets for a 14 m tunnel boring machine
500+ T for a 14 m road tunnel, assembled in house
Architecture · Kinshasa, DR Congo
A 28 m steel dome for a house of worship in Kinshasa
A 28 m dome, 26 m high, shipped to DR Congo
Roads · Uttar Pradesh
Nine toll plaza canopies on the Ganga Expressway
9 toll plazas and a 38 m gateway arch, 1,200+ T
Tunnels · Mumbai
Conveyors and brackets for a 14 m tunnel boring machine
500+ T for a 14 m road tunnel, assembled in house
Architecture · Kinshasa, DR Congo
A 28 m steel dome for a house of worship in Kinshasa
A 28 m dome, 26 m high, shipped to DR Congo
Start a project
Send us a drawing
A project like this?
Send the drawings and an engineer will tell you how we would build it.