
- Tunnel
- 14 m diameter road tunnel
- Steel
- 500+ T
- Scope
- Belt storage, conveyor, brackets
- Tested
- Assembled in our works
- Status
- Delivered
The project
Everything a TBM carries has to fit inside the tunnel and survive the drive. The conveyor was assembled and tested before it left.
What we made
- Detail design
- Conveyor structure and belt storage
- Conveyor brackets, staged in racks
- In-house assembly test
How we built it
- Robotic H-beam cutting and bevelling cellSections cut and coped by robot.
- Kotec newRun10DX CNC beam drilling lineBrackets drilled to the bolt pattern.
Delivered after a full assembly test in our works.
More case studies
Architecture · Kinshasa, DR Congo
A 28 m steel dome for a house of worship in Kinshasa
A 28 m dome, 26 m high, shipped to DR Congo
Tunnels · Sydney, Australia
Tunnel formwork gantry for the Sydney Metro
1,800+ T of track-mounted tunnel formwork
Ports · Paradip Port, Odisha
Accropode breakwater moulds for a jetty at Paradip
2 to 6 m³ moulds made to CLI guidelines
Architecture · Kinshasa, DR Congo
A 28 m steel dome for a house of worship in Kinshasa
A 28 m dome, 26 m high, shipped to DR Congo
Tunnels · Sydney, Australia
Tunnel formwork gantry for the Sydney Metro
1,800+ T of track-mounted tunnel formwork
Ports · Paradip Port, Odisha
Accropode breakwater moulds for a jetty at Paradip
2 to 6 m³ moulds made to CLI guidelines
Start a project
Send us a drawing
A project like this?
Send the drawings and an engineer will tell you how we would build it.