The project
A new machine with no Indian precedent: fabricated structure and machined parts that had to work together first time.
What we made
- Customised structural fabrication
- Machined parts
- Assembly
How we built it
- SKDX1030 CNC end-face millingMounting faces machined.
- Kotec newRun10DX CNC beam drilling lineStructure drilled to the pattern.
Delivered as India’s first ship loader for cement.
More case studies
Bridges & metro · Mumbai
Stainless steel piers, pier caps and girders for the Mumbai Metro
25,000+ T of IRS 450 stainless steel
Roads · Uttar Pradesh
Nine toll plaza canopies on the Ganga Expressway
9 toll plazas and a 38 m gateway arch, 1,200+ T
Tunnels · Mumbai
Conveyors and brackets for a 14 m tunnel boring machine
500+ T for a 14 m road tunnel, assembled in house
Bridges & metro · Mumbai
Stainless steel piers, pier caps and girders for the Mumbai Metro
25,000+ T of IRS 450 stainless steel
Roads · Uttar Pradesh
Nine toll plaza canopies on the Ganga Expressway
9 toll plazas and a 38 m gateway arch, 1,200+ T
Tunnels · Mumbai
Conveyors and brackets for a 14 m tunnel boring machine
500+ T for a 14 m road tunnel, assembled in house